• Welcome to National Homebrew Club Ireland. Please login or sign up.
July 19, 2025, 06:26:01 AM

News:

Renewing ? Its fast and easy - just pay here
Not a forum user? Now you can join the discussion on Discord


Keggle build and future proofing

Started by Joe Rocket, June 17, 2014, 01:33:23 PM

Previous topic - Next topic

Joe Rocket

Hi folks-
Hoping for a steer on getting my first BIAB Electric Keggle set-up on the go...I have a couple of good full size kegs perfect condition, relatively new, and an older keg, pulled from a river. I'm looking at drilling and attaching 2x argos value elments onto one of the newer kegs, and connecting up to a controller. From what I can gather, a PID is the way to go for this sort of set up, but would like confirmation of this for controlling a mash/boil. I understand that a SSD would be required here too.

Additionally, I might be interested in the potential of expanding to a three vessel set up eventually to make use of all the kegs- are there any do's and don'ts with regards the initial keg to make this achieveable in the future?

Finally, I'm lucky enough to have got my hands on three corny's and a rake of CO2 & mixed gases, a handful of regulators, and a tap. Once I get a freezer, I think the STC1000 would be sufficient for temp control here- I assume theres no chance of buying a controller that would control the keggle mash/boil on a brewday, and be suitable for longterm switching of the Keezer too?

Any advice about Irish keggle building would be welcome! Thanks in advance.

Bossgigidy

Quote from: Joe Rocket on June 17, 2014, 01:33:23 PM
Hi folks-
Hoping for a steer on getting my first BIAB Electric Keggle set-up on the go...I have a couple of good full size kegs perfect condition, relatively new, and an older keg, pulled from a river. I'm looking at drilling and attaching 2x argos value elments onto one of the newer kegs, and connecting up to a controller. From what I can gather, a PID is the way to go for this sort of set up, but would like confirmation of this for controlling a mash/boil. I understand that a SSD would be required here too.

Additionally, I might be interested in the potential of expanding to a three vessel set up eventually to make use of all the kegs- are there any do's and don'ts with regards the initial keg to make this achieveable in the future?

Finally, I'm lucky enough to have got my hands on three corny's and a rake of CO2 & mixed gases, a handful of regulators, and a tap. Once I get a freezer, I think the STC1000 would be sufficient for temp control here- I assume theres no chance of buying a controller that would control the keggle mash/boil on a brewday, and be suitable for longterm switching of the Keezer too?

Any advice about Irish keggle building would be welcome! Thanks in advance.
Hi, was looking to do something similar and found this old thread. How did this work out for you? Did you get it built?

Sent from my HUAWEI LYO-L01 using Tapatalk


nigel_c

Have a google for "the electric brewery"
Great source for building a kettle.